Sage 100 Reports

06-01-12-16 Committed Cost Report By Cost Code And Cost Type

$675.00

SKU: R06011216 Category:

06-01-12-16 Committed Cost Report by Cost Code 7 Cost Type

Description

06-01-12-16 Committed Cost Report by Cost Code 7 Cost Type

Visualize not only the committed cost, but also the remaining cost, and how it got there.

Easy analysis of data because cost code data is shown by cost type as well.

Column Headings include:

  • 3 Budget & Change columns  (Contract, COs, New Contract)
  • 2 Cost columns  (Cost to Date, % Complete, Projected Costs)
  • 3 Committed Cost columns  (All POs, All Subcontracts, Total Committed)
  • 1 Remaining Costs column

Report runs as of the date printed only (What is the status today!).

Selection Criteria:  Job #, Cost Code, Division #)

Download a sample PDF to view whole report.

Reviews

There are no reviews yet.

Be the first to review “06-01-12-16 Committed Cost Report By Cost Code And Cost Type”

Your email address will not be published. Required fields are marked *